$15,000 HomeBuilder Grant Find Out More

Ramsay Project Before and After

Ramsay Project

Maximisation – 1 into 3

The client came up to us requiring assistance to create a feasible development out of an exceptionally tricky block.

This site was situated next to a power station incurring extra costs, with the developer initially wanting to do two dwellings on the allotment and being faced with a right of way that ran across the back of the site.

Through consultation and research, Lofty was able to find a way to build three double garage dwellings to fit the site, therefore spreading the cost, and meet Council requirements by rear loading the dwellings.

The developer was able to maximise the site and achieve a solid return on investment where a loss was initially looking likely.